Muskoka · more than one SB-1 value — tell us the town

HVAC Design Muskoka: Zone 6 at -26°C — Ontario's Most Demanding Residential Heating Condition

Muskoka is not one of the municipalities listed in SB-1, so the outdoor design temperature for your calculation is not a number you can simply look up. Here is how that is properly resolved, and what Muskoka asks for with a permit application.

This page covers what a correct HVAC design package for a Muskoka building permit includes, what -26°C demands from every system type, and which of the six Muskoka municipalities your permit goes to. For the heat loss foundation and full permit documentation, see our Muskoka heat loss and permit guide. For the radiant-specific design considerations at -26°C, see our Muskoka radiant heating design page.

At -26°C, a GTA-calibrated HVAC design comes up roughly 20% short. Tell us your Muskoka municipality — six separate building departments, one correct design temperature each.
Get Your Muskoka HVAC Design
Upload your floor plans and tell us your municipality — we'll confirm the Zone 6 requirements and deliver in 48 hours.
Optional. PDF or images. If your plans are still with the designer, skip this — we will ask for them with the quote. For a basement apartment or ADU no drawings are needed: use the self-survey instead.
Free quote · No spam · No obligation

There is no single design temperature for Muskoka

Muskoka covers more than one SB-1 location, and they do not share a value. SB-1 lists Gravenhurst, Bracebridge, Huntsville separately.

Tell us the town, not the region, and we will use the right row. Any calculator or designer that prints one temperature for the whole of Muskoka is guessing.

Source: Ontario Building Code SB-1 (2024), Table 2 — Climatic Design Data.

What each document actually is

Document What it is
Heat loss and heat gain calculations The room-by-room load. Everything else is sized off this.
Formula sheet The working behind the numbers, so a reviewer can follow them.
Thermal load calculator The envelope assemblies and areas the loads were built from.
Air leakage calculator The infiltration assumption, stated rather than buried.
Residential ventilation summary The OBC 9.32 ventilation design, on the HRAI summary form.
Duct design and layout Supply and return sizing, register locations, cfm per room.
Energy Efficiency Design Summary How the house meets SB-12, prescriptive or performance.
Radiant in-floor design Loop layout, spacing, manifolds and lengths.
Hydraulic load calculations Flow and head for a hydronic system.

Who is allowed to sign it

You hire a qualified designer. They complete the Schedule 1 Designer Information Form with their BCIN and take responsibility for the design.

You are the owner, building on your own lot. Ontario Building Code Division C, Article 3.2.5.1.(3)(b)(i) exempts an owner who designs a house they own from the designer qualification requirements. You can file the documents yourself. The calculations still have to be correct — the exemption is about who may design, not about the standard the work has to meet.

Tell us which applies and we will tell you what you need before you pay.

What it costs

Includes Price Turnaround
Heat loss and heat gain Room-by-room loads, worksheet, design conditions, equipment sizing basis, assumptions, seal page $395 48 hours
Full mechanical package The above plus ventilation design, duct design and layout, EEDS, and radiant layout where applicable $695 48 hours

Forty-eight hours from complete plans and payment. If the building department asks for a correction to something we got wrong, we fix it and reissue at no charge while your application is open.

See a complete sample package →

Common questions

Do I need all of these documents? Not always. A heat loss calculation alone satisfies some permits; a new dwelling with a hydronic system needs close to the full list. Send the plans and we will tell you which.

The department has already asked and my build is held up. That is the most common reason people call. The 48-hour turnaround exists for exactly that.

My HVAC contractor says he will size it. He may be right about the equipment. The building department still needs the documents, and the Code requires equipment capacity to be based on the calculated design heat loss.

I'm adding a basement apartment, not building a house. Different job: no drawings, an existing furnace, and a check that it can carry both units. Here is how that works → The design temperature and the checklist above apply to it just the same.

Does an ICF or high-performance house change the answer? Same procedure, different inputs. The result usually comes out substantially lower, and more of the difference comes from air sealing than from the wall's R-value. We run that comparison on every job.

Start

Send your plans — we'll tell you what you need before you pay →

Get Your Muskoka HVAC Design Package

-26°C. Zone 6. Six Municipalities. Correct Package in 48 Hours.

Tell us your Muskoka municipality and property type — lakefront custom home, seasonal conversion, year-round build, or ICF project. We'll confirm the correct building department, run the CSA F280 load at -26°C, produce the complete mechanical package, BCIN-stamp every page, and deliver in 48 hours. For full custom ICF builds with all mechanical engineering, our partner icfhome.ca has been coordinating complete Muskoka projects since 1995.

  • Correct Muskoka municipality confirmed — all six building departments served
  • CSA F280 heat loss at -26°C — Zone 6, waterfront exposure assessed
  • System selection guidance — furnace, heat pump, hybrid, or radiant
  • Mechanical drawings — BCIN-stamped on every page
  • MVDS — HRV/ERV design for OBC 2024 compliance
  • Schedule 1 — signed, correct municipality, 48-hour delivery
Get Your Free Quote
Tell us your Muskoka municipality, property type, and planned heating system.
Optional. PDF or images. If your plans are still with the designer, skip this — we will ask for them with the quote. For a basement apartment or ADU no drawings are needed: use the self-survey instead.
Secure · No spam · No obligation to buy
Ontario Heat Loss & BCIN Design Permit-ready heat loss calculations, HVAC design, and BCIN-stamped mechanical drawings for homeowners, builders, and designers across Ontario. Fast turnaround: free quote in 24 hours, most reports delivered within 48 hours after payment. Call 705-533-1633.
© 2026 Ontario Heat Loss & BCIN Design. All rights reserved.