CSA F280 Heat Loss Calculation for Your Ontario Building Permit
A heat loss calculation works out how much heat your house loses on the coldest day of the year, room by room, so the heating system can be sized to match it. Ontario building departments ask for one with most residential permit applications, and they expect it to follow CSA F280-12. It costs $395 and takes 48 hours.
- Room-by-room heat loss breakdown
- Total design heat loss in BTU/h
- Equipment sizing recommendations
- Reviewed and sealed by a BCIN-registered designer
- Heat gain (cooling load) included
- One revision included at no charge
- 48 hours from complete plans
What your building department is actually asking for
The wording varies. The City of Barrie's new dwelling checklist, for example, asks for heat loss and heat gain calculations, a formula sheet, a thermal load calculator and an air leakage calculator, and states that they "must meet HRAI-CSA F280-12 or ASHRAE design standards." Other municipalities ask for "heat loss" or "HVAC design" and mean something similar.
If the letter you received names a document you have never heard of, send it to us and we will tell you what it is.
What we need from you
Four things, and most people already have three of them:
| Why | |
|---|---|
| Floor plans, all levels, with dimensions | Areas and room-by-room geometry |
| Elevations, or a window and door schedule | Glazing is 25–45% of the load and is never assumed |
| Wall, roof and foundation assemblies | From the section drawings or your builder's spec |
| Your municipality | Sets the outdoor design temperature from SB-1 |
If you don't have the assemblies, say so. We will use the current code minimums for your climate zone and flag every one of them on the assumptions page, so your reviewer can see exactly what was assumed and correct it if your build differs.
What you get
For the full mechanical package, nineteen pages that cover everything the HVAC designer signs: a submission checklist, room-by-room heating and cooling loads with design airflows, the surface-by-surface worksheets, the equipment and ventilation schedule, HVAC floor plans with the duct layout drawn on each level, the duct system summary and branch detail, the ventilation design data for OBC 9.32, the Energy Efficiency Design Summary data, an assumptions page listing anything assumed rather than read, and the review-and-seal page. The $395 heat loss and heat gain is the first half of that set.
The checklist page also names what the permit needs from others — the architectural drawings, a lot grading plan where the municipality wants one, an energy model if the house cannot meet the prescriptive package — so nothing arrives as a surprise after you apply.
See the complete sample package — all 19 pages →
That sample is a worked example — a code-minimum two-storey in Barrie, not a real client's house. It shows you exactly what arrives.
Why the number matters more than people expect
The sample house above, 3,020 ft² built to current SB-12 minimums in Barrie, loses 30,472 Btu/h at the design temperature. A contractor sizing it by square footage would commonly land on a 100,000 Btu/h furnace. That's roughly three times what the house needs.
An oversized furnace short-cycles, heats unevenly, wears faster and costs more to buy. This is the single commonest expensive mistake in Ontario residential heating, and the calculation is what prevents it.
Who can sign it
Two routes, and most people are only told about the first.
You hire a qualified designer. They complete the Schedule 1 Designer Information Form with their BCIN and take responsibility for the design. That is what we do for you.
You are the owner, building on your own lot. Ontario Building Code Division C, Article 3.2.5.1.(3)(b)(i) exempts an owner who designs a house they own from the designer qualification requirements. You can submit the documents yourself. The calculations still have to be right — the exemption is about who may design, not about the standard the work has to meet.
Tell us which you are and we will tell you what you need before you pay.
What it costs
| Includes | Price | Turnaround | |
|---|---|---|---|
| Heat loss and heat gain | Room-by-room loads, worksheet, design conditions, equipment sizing basis, assumptions, seal page | $395 | 48 hours |
| Full mechanical package | The above plus ventilation design, duct design and layout, EEDS, and radiant layout where applicable | $695 | 48 hours |
Forty-eight hours from complete plans and payment. If your building department asks for a correction to something we got wrong, we fix it and reissue at no charge while your application is open.
Common questions
Is a heat loss calculation required by the Ontario Building Code? The Code requires heating equipment capacity to be based on the calculated design heat loss (Article 9.33.5.1), and references CSA F280 for how that calculation is done. Whether a particular permit application needs the document in the file is set by your municipality's submission requirements, which is why those vary.
Can I do it myself? If you own the lot and are designing your own house, yes — see the exemption above. Online estimators are not the same thing; they give a whole-house number with no room-by-room breakdown and no assumptions page, which is what a reviewer reads first.
My HVAC contractor says he'll size it. He may be right about the equipment. The building department still needs the document, meeting F280-12, with a Schedule 1 behind it.
The department has already asked for it and I'm holding up my build. That's the most common reason people call. The 48-hour turnaround exists for exactly that.
Does an ICF or high-performance house need a different calculation? Same procedure, different inputs. The result usually comes out substantially lower, and more of the difference comes from air sealing than from the wall's R-value. We run that comparison on every job.
How accurate is it? Our engine is checked against stamped packages produced by independent Ontario designers. On the most recent one it reproduced the structural load to within 0.0% and every component to within 0.4%. We publish the verification status of our software on every page we produce, including the fact that it has not completed the CSA F280-12 Clause 8 software verification — nobody should take a conformity claim on trust, including ours.
Start
Send your plans — we'll tell you what you need before you pay →
Adding a basement apartment, garage suite or ADU to a house you already own? That is a different job — no drawings, an existing furnace, and the question of whether it can carry both units. Start here instead →
Don't have plans in hand yet? Tell us about the project and we'll tell you what the permit will ask for.
Upload Your Plans Today. CSA F280 Report in 48 Hours.
Stop waiting. Get the heat loss calculation your Ontario building permit requires — without the 2-week wait most designers charge.
- Free quote — upload plans at no cost
- BCIN-stamped CSA F280-12 report
- Room-by-room heat loss breakdown
- Equipment sizing recommendations included
- Delivered within 48 hours of complete plans
- built to what Ontario building departments ask for
- One free revision if your plans change
Complete Your Ontario Building Permit Package
Most permit packages require more than just a heat loss report. Add these services to complete your submission.
Full HVAC Design & Mechanical Drawings
Complete duct layout, equipment schedule, ventilation summary, and BCIN-stamped mechanical drawings. From $695.
Cold-Climate Heat Pump Sizing
Accurate heat pump sizing using your CSA F280 load data. Qualifies for government rebates. From $295.
HRV/ERV Ventilation Design
OBC-compliant whole-home ventilation design, HRV/ERV selection, and fresh air distribution. From $295.
Radiant Floor Heating Design
Full hydronic radiant floor layout, manifold sizing, loop lengths, and boiler specifications. From $395.
More on Heat Loss Calculations
Every guide in this section, plus our other main topics.
- Ontario Heat Loss Calculator: Your Design Heat Load in 30 Seconds
- How Much Do Heat Loss Calculations Cost in Ontario? 2026 Guide
- Why Is CSA F280 Mandatory in Ontario?
- Manual J vs CSA F280 in Canada: Which Load Calculation Do You Need?
- Heating Design Temperature in Ontario?
- Heat Loss vs Heat Gain Calculation Explained
- Why Your CSA F280 Heat Loss Calculation Gets Rejected by Ontario Building Departments
- Heat Loss Calculation for Renovations and Additions Ontario
- Heat Loss Calculation for Home Additions Ontario
- Heat Loss Calculations for ICF Homes Ontario
- What Size Furnace Do I Need in Ontario?
- Oversized Furnace Problems: Why Bigger Is Costing You Comfort and Money
- Sizing an Air Conditioner for a Custom Home Ontario
- Full HVAC Design & Mechanical Drawings Ontario
- Building Permit HVAC Requirements Ontario: What Municipalities Actually Ask For
- HRV / ERV Design Ontario: Better Air Starts With Better Planning
- Radiant Floor Heating Design Ontario: Warm Floors Are Easy, Correct Design Is the Hard Part
- Cold Climate Heat Pump Ontario: What Actually Works When Winter Stops Being Polite
- HVAC Design for Legal Basement Apartments Ontario
- Why Is One Room Always Cold?
- Turning a Cottage Into a Year-Round Home
- Furnace Sizing Rules of Thumb
- Heat Loss Second Opinion
Ready for the real thing? Get a BCIN-stamped heat loss and HVAC design in 48 hours.