Ontario HVAC Permit Checklist: Every Document Required for a New Home Mechanical Permit Under OBC 2024
This is the complete OBC 2024 HVAC permit document checklist for Ontario residential new construction — every document required, every BCIN requirement, every municipality-specific consideration. Use it before submitting any permit application to confirm the package is complete. A single missing document returns the entire application before technical review begins.
For any document you need produced, see the linked service pages. Every package we produce covers this entire checklist as a standard — nothing missing, nothing assumed. For the full background on what each document is and why it's required, see our HVAC permit requirements guide.
Check every item before submitting. A single missing item returns the entire application. Items marked with an orange note have been the most consistent rejection causes across Ontario municipalities.
Every permit package we produce covers all five documents: CSA F280 at the confirmed design temperature, mechanical drawings, MVDS, Schedule 1, and BCIN stamp on every page. We confirm the design temperature before calculating, flag pre-conditions for your municipality, and format for your portal. Upload your floor plans and we'll send a firm flat-rate price within 24 hours. Complete package in 48 hours. See our heat loss calculation service and our HVAC design and mechanical drawings service.
Need the complete package? We produce every item on this checklist — BCIN-stamped, portal-formatted, 48 hours. Nothing missing, nothing assumed.
Get Free Quote →Upload your floor plans and we'll produce the complete five-document OBC 2024 HVAC permit package — CSA F280 at your confirmed design temperature, mechanical drawings, MVDS, Schedule 1 — BCIN-stamped on every page and formatted for your municipality's portal. 48-hour delivery, flat-rate pricing.
- Design temperature confirmed for your specific municipality
- CSA F280 room-by-room heat loss — permit-ready
- Mechanical drawings — duct layout with CFM at every outlet
- MVDS — HRV/ERV design, SRE at -25°C, SB-12 compliance
- Schedule 1 · BCIN stamp every page · Portal formatted · 48h