CSA F280-12 Certified · BCIN Stamped · Hamilton & Area

HVAC Design Hamilton — Complete Mechanical Drawings for Your Permit. Century Brick to New Build. BCIN-Stamped. 48 Hours.

Upload your floor plans today. Get a firm quote in 24 hours. Receive duct design, mechanical drawings, MVDS and the CSA F280 heat loss calculation — the full package Hamilton Building requires, from Stoney Creek to Dundas.

24hQuote turnaround
48hPackage delivery
-17°CDesign temperature
$695Flat-rate package
Upload Plans & Get Free Quote →
Get Your Quote in 24 Hours
Upload your floor plans — we’ll review and send your price. Free, no commitment.
Secure · No spam · No obligation to buy
HRAI CertifiedHVAC Design
BCIN StampedAll reports
CSA F280-12Certified
45+ YearsExperience
250+ HomesReports approved
Why the Full Package Matters

Hamilton’s Housing Stock Is Century Brick — and Old Ducts Don’t Survive a Conversion Unexamined

Half of Hamilton’s permit activity happens inside houses built before 1950: solid-brick two-and-a-halfs on the lower city grid getting duplexed, wartime bungalows on the Mountain adding basement suites, Dundas and Ancaster homes getting rebuilt outward. In every one of those projects, the existing gravity-era ductwork is the weak point — and since OBC 2024, the plans examiner expects a real duct design, not just a heat loss number. A calculation alone tells you the load; the mechanical drawings show how the air actually gets to a third-floor room behind two wythes of brick.

❄️

Heat Loss Report With No Duct Design

A conversion or addition permit that shows loads but no distribution design gets questions: which runs serve the new suite, what CFM does each room get, where does return air come from? Missing drawings mean resubmission.

Examiner questions guaranteed
⚠️

Reusing Gravity-Era Ductwork As-Is

Century Hamilton homes often have oversized, leaky trunk lines from converted gravity furnaces. Assuming they can serve a new suite or addition without verification produces starved rooms — and non-compliant designs.

Comfort complaints built in

Complete BCIN Mechanical Package

Room-by-room CSA F280 at -17°C, full duct layout with per-room CFM, equipment selection, MVDS and Schedule 1 — drawn, stamped and formatted for Hamilton Building Division submission.

Accepted first submission
Download Free HVAC Permit Checklist Free PDF — no email required. See also our full guide to building permit HVAC requirements in Ontario.
What You Receive

Exactly What Hamilton Building Division Expects to See

Duplex and triplex conversions in the lower city, basement suites on the Mountain, additions in Dundas, Ancaster and Waterdown, and new builds in Binbrook — one complete mechanical package for all of them.

1

Room-by-Room CSA F280 Heat Loss & Gain

Every room calculated separately at Hamilton’s -17°C design temperature — walls, windows, ceiling, floor, infiltration.

2

Equipment Sizing Sheet

Right-sized furnace, heat pump, boiler, or AC matched to the calculated load — not a square-footage guess.

3

Duct or Hydronic Layout Drawings

Fully dimensioned supply and return layout with airflow for every room per HRAI standards.

4

MVDS & Ventilation Design

The Mechanical Ventilation Design Summary — mandatory on every Ontario new-home permit since January 1, 2025 — plus HRV/ERV selection.

5

Schedule 1 & BCIN Stamp on Every Page

Signed designer declaration and BCIN stamp throughout — exactly what Hamilton Building Division requires before issuing your permit.

Sample Report — Century Brick Duplex Conversion, Hamilton ON
LocationHamilton (Gibson), ON
Design Temperature-17°C
Building1912 solid brick, 2.5 storey
Main Unit1,480 sq ft
Second Unit760 sq ft
DistributionNew duct design, both units
Units Calculated SeparatelyYes
Design Heat Loss (CSA F280)58,600 BTU/h

Solid-brick walls with no cavity insulation carry loads a modern-house rule of thumb misses badly — and the new suite gets its own independently controlled system, drawn run by run.

Local Knowledge

Serving Hamilton, Stoney Creek, Dundas, Ancaster & Waterdown

Hamilton’s conversion boom runs on the full package: the city wants to see the CSA F280, the duct design serving each unit, ventilation with an MVDS, and a signed Schedule 1. We produce all of it from your floor plans, BCIN-stamped, in 48 hours.

Escarpment geography matters here — lower-city lake effect and Mountain exposure are not identical conditions, and century masonry changes the envelope math entirely. Every room is calculated with its real assembly, not a subdivision default.

Hamilton
Stoney Creek
Dundas
Ancaster
Waterdown
Binbrook
Not on the list? We serve all of Ontario — Windsor to Thunder Bay. See every municipality we cover →

Only Need the Heat Loss Report?

The full HVAC design package is $695 flat. If your Hamilton project only requires the certified CSA F280 heat loss calculation, that’s $395 — see the Hamilton heat loss page. Same 48-hour delivery.

→ Order a certified heat loss calculation
Common Questions

HVAC Design & Permits in Hamilton — Answers Before You Ask

The questions Hamilton homeowners and builders ask most — answered in plain language.

What’s the difference between this and the $395 heat loss report?

The $395 report is the certified CSA F280 calculation only. The $695 package adds the full mechanical design: duct layout with per-room CFM, equipment selection, ventilation design with MVDS, and stamped drawings — what Hamilton asks for on conversions, additions and new builds. Just need the report? →

Does a Hamilton duplex or triplex conversion need mechanical drawings?

Yes — each new unit needs independently controlled heating shown on a drawing, its own heat loss numbers, and ventilation documentation. Extending the existing furnace to a new unit without a design is the most common Hamilton resubmission.

Can you design around existing century-home ductwork?

Where it verifies, yes — we assess the existing trunk capacity in the design and reuse what works. Where it doesn’t, the drawings show exactly what to replace, so your contractor prices the real scope instead of discovering it mid-job.

How fast can I have the permit package?

Firm quote within 24 hours of uploading your plans; complete BCIN-stamped package within 48 hours of payment. If we miss the 48 hours, it’s free.

Get Started Today

Upload Your Plans. Hamilton Permit Package in 48 Hours.

Get the duct design, mechanical drawings and certified CSA F280 calculation Hamilton Building Division requires — conversions, additions and new builds, BCIN-stamped throughout.

  • Free quote — no commitment to buy
  • CSA F280 at Hamilton’s correct -17°C design temperature
  • MVDS and Schedule 1 included
  • BCIN-stamped on every page
  • 48-hour delivery after payment
Get Your Free Quote Now
Upload your plans and fill in your details — we respond within 24 hours.
Prefer to talk first? Contact us here →
Ontario Heat Loss & BCIN Design Permit-ready heat loss calculations, HVAC design, and BCIN-stamped mechanical drawings for homeowners, builders, and designers across Ontario. Fast turnaround: free quote in 24 hours, most reports delivered within 48 hours after payment. Call 705-533-1633.
© 2026 Ontario Heat Loss & BCIN Design. All rights reserved.
BCIN CSA F280-12 Province-Wide
Building in Georgian Bay or Simcoe County? This site is run by the team at ICFhome.ca — 300+ custom homes since 1979. Our ICF showhome heats for about $100/month at the coldest. 705-533-1633