BCIN Certified · Province-Wide · 48-Hour Delivery

HVAC Engineering Services for Ontario Building Permits

Every service we offer is produced by a BCIN-registered HVAC designer, delivered within 48 hours, and accepted by every Ontario municipality. Upload your floor plans for a free quote — no commitment required. Not sure what you need? Read our guide on permit rejection causes to understand exactly what's required before you order.

CSA F280 Heat Loss Full HVAC Design Heat Pump Sizing HRV/ERV Ventilation Radiant Heating Design
All Services
Choose the Service Your Project Needs

Not sure which service you need? The most common starting point is the CSA F280 Heat Loss Calculation — it's required for every Ontario building permit and forms the foundation for everything else. If you need a complete permit package, the Full HVAC Design Package covers everything in one submission. For a full breakdown of what each municipality requires, see our areas we serve page.

CSA F280 Heat Loss Calculation

The mandatory heating load calculation required by Ontario Building Code Section 9.33.2.2. Uses your actual floor plans, wall assemblies, and Ontario design temperatures to calculate heat loss room by room. The BCIN-stamped report your permit application cannot proceed without. Use our free design temperature tool to confirm your municipality's design day before ordering.

Ontario Building Code §9.33 Room-by-room analysis BCIN stamped All municipalities
From $395
Delivered in 48 hours
View Service →

Full HVAC Design & Mechanical Drawings

The complete Ontario building permit package — heat loss calculations, full duct layout drawings, Mechanical Ventilation Design Summary, equipment schedule, and Ontario Schedule 1 designer declaration. Everything your building department needs in one stamped submission. See our HVAC design page for the full breakdown, and our rejection guide for what this package prevents.

OBC Part 9 §9.32 & 9.33 Duct layout drawings Schedule 1 included First-try acceptance
From $695
Delivered in 48 hours
View Service →

Cold-Climate Heat Pump Sizing

Accurate heat pump sizing using certified CSA F280 load data — not square footage rules of thumb. Confirms cold-climate performance at -15°C and -25°C for Ontario's design temperatures. Produces rebate-qualifying documentation for Ontario's Home Renovation Savings Program (up to $7,500). See our cold-climate heat pump page for equipment certification requirements and our heat pump guide for zone-by-zone performance data.

CSA F280-based Performance at -25°C Rebate documentation Hybrid systems
From $295
Add-on or standalone
View Service →

HRV & ERV Ventilation Design

Mandatory under Ontario's updated Building Code since January 1, 2025. We calculate your home's Total Ventilation Capacity, select the right HRV or ERV, design the supply and exhaust distribution, and produce the MVDS form your permit application requires. OBC 2024 and CAN/CSA-F326 compliant. Missing the MVDS is one of the most common reasons applications are returned — see our rejection guide for the full list.

OBC 2024 mandatory CAN/CSA-F326 HRV or ERV selection SB-12 compliant
From $295
Standalone or included in full package
View Service →

Radiant & Hydronic Heating Design

Complete hydronic radiant floor heating design built on a certified CSA F280 room-by-room heat loss calculation. Includes PEX loop layout drawn over your floor plans, loop lengths and spacing, manifold locations, zone mapping, supply water temperature targets, and boiler or heat pump sizing. CAN/CSA-B214 compliant. Particularly suited to ICF construction in Simcoe County and Georgian Bay — for why ICF homes pair so well with radiant, see the best heating systems for ICF homes and the real cost of hydronic radiant in Ontario.

CAN/CSA-B214 PEX loop layout Manifold & zone design Boiler sizing ICF compatible Heat pump compatible
$395
Starting from Delivered in 48 hours View Service →
The Process
How Every Service Works — Four Steps, 48 Hours

The same straightforward process applies to every service we offer. Upload your plans, receive a firm flat-rate quote, pay securely online, and receive your BCIN-stamped report within 48 hours.

1

Upload Your Plans

Send your floor plans in any format — PDF, CAD, JPG, or hand drawings. Free, no commitment.

Today
2

Receive Your Quote

We review your project and send a firm flat-rate price. No hourly billing, no surprises.

Within 24 hours
3

Pay Securely Online

Approve your quote and pay via Stripe. Your report enters production immediately.

When you're ready
4

Receive Your Report

BCIN-stamped report delivered by email — ready for your Ontario permit application.

Within 48 hours

Our 48-Hour Delivery Guarantee

Report or package not delivered within 48 hours of payment? Full refund. No questions asked.

48hMax delivery
100%First-submission rate
$0Cost to get a quote
250+Reports delivered
Common Combinations
Not Sure What You Need? Start Here.

Most Ontario building permit applications need more than one service. Here are the three most common combinations — and what each one covers. For municipality-specific requirements in your area, see our areas we serve page.

Starter

Heat Loss Only

The minimum required for any Ontario residential building permit. Suitable if your building department only requires a heat loss report and your HVAC installer handles the rest.

  • CSA F280 heat loss calculation
  • Room-by-room heating load
  • Equipment sizing recommendations
  • BCIN designer stamp & signature
$395 and up
Get Heat Loss Report →
Radiant Builds

Radiant + Full Permit Package

For homes with hydronic radiant floor heating as the primary system. Combines the complete mechanical permit package with a full radiant loop layout and boiler or heat pump specification.

  • CSA F280 heat loss (room-by-room)
  • Radiant PEX loop layout drawings
  • Manifold & zone design
  • HRV/ERV ventilation design
  • Boiler or heat pump sizing
  • BCIN stamp & signature
From $895 combined
Get Combined Quote →
Why Choose Us
BCIN-Certified. 48-Hour Delivery. Accepted Everywhere in Ontario.

We've built this service for one purpose — to get Ontario homeowners and builders their permit package fast, without the two-week wait that most designers charge for. For ICF custom home builds with all-in HVAC engineering, see our partner icfhome.ca for Ontario rebate information.

BCIN
Registered HVAC designer — qualification: Building Services, HVAC-House
48h
Maximum delivery time — guaranteed or full refund
100%
First-submission acceptance rate at every Ontario municipality
45+
Years of combined HVAC engineering experience behind every report
Get Started
Upload Your Plans. Free Quote in 24 Hours.

Not sure which service you need? Upload your floor plans and describe your project — we'll tell you exactly what your building department requires and send a firm price within 24 hours. No commitment to buy. Or read our permit rejection guide to understand exactly what your municipality needs before you submit.