About Ontario Heat Loss & BCIN Design: HVAC Engineering That Actually Knows Simcoe County
We are a BCIN-registered HVAC design service based in Simcoe County, Ontario. We do one thing: produce accurate, permit-ready CSA F280 heat loss calculations and HVAC mechanical drawings that pass Ontario building department review on first submission — for any municipality in the province, delivered in 48 hours.
Ontario Heat Loss & BCIN Design is a BCIN-registered HVAC design practice based in Simcoe County, serving every Ontario municipality. We produce CSA F280 heat loss calculations and complete permit packages — 250+ approved, zero rejected, 100% first-submission pass rate. Free quote in 24 hours, reports delivered in 48.
Why We Built This Service
The problem we set out to solve is simple and frustrating: builders and homeowners in Simcoe County and across Ontario were routinely losing weeks to rejected permit submissions — not because the building was wrong, but because the HVAC package was incomplete, stamped incorrectly, used the wrong design temperature, or wasn't formatted for the municipality's portal. We wrote an entire guide on why heat loss calculations get rejected by Ontario building departments — the causes are almost always paperwork, not engineering.
We are based in Simcoe County and have been designing and building homes here for years through our partner icfhome.ca. We know that Barrie uses -24°C and Collingwood uses -22°C. We know that Oro-Medonte requires Cloudpermit and a Zoning Certificate before the building permit, that Wasaga Beach requires a Road Occupation Permit uploaded alongside the building application, and that Tiny Township's one-month review clock only starts on a complete submission. We know these things because we've dealt with every one of them on real projects.
What started as the engineering we did in-house for our own builds became a standalone service when other builders started asking us to produce their permit packages. The demand made sense — finding a BCIN-registered HVAC designer who knows North Simcoe and Georgian Bay's specific building department requirements, and who can turn around a stamped package in 48 hours, is harder than it should be. You can read more about what a complete permit package includes on our CSA F280 heat loss service page.
Ontario Heat Loss & BCIN Design is a focused service. We don't do site visits, we don't install equipment, and we don't manage your build. We produce accurate, correctly-formatted, BCIN-stamped mechanical drawings and full HVAC design packages that pass your building department on the first submission. That's the whole service. We've designed it to be fast, flat-rate, and reliable — because that's what builders and homeowners actually need. For a deeper understanding of what heat loss calculations mean for a new home build, our partner site has a plain-English breakdown.
We work with homeowners managing their own self-builds, contractors who need a reliable HVAC designer on call, and architects who need a BCIN stamp on their mechanical drawings. Every project — from a 900 sq ft Tiny Township cottage to a 6,000 sq ft Muskoka custom home — gets the same attention to the correct design temperature, the right portal format, and the local submission requirements that protect your timeline. If you're planning a cold-climate heat pump as your primary heating system, see our heat pump sizing service — sizing from your actual CSA F280 heat loss is the only way to get it right in Ontario winters.
icfhome.ca — Custom ICF Homes Across Georgian Bay & Simcoe County
Who Actually Signs Your Report
A BCIN stamp isn't a logo — it's a person, registered with the Ontario Ministry of Municipal Affairs and Housing, who takes legal responsibility for the design. Here's who that is on every report we deliver.
[BCIN DESIGNER NAME]
BCIN-Registered HVAC Designer — House (HVAC) Qualification BCIN #[XXXXX] — verify at the QuARTS public registryEvery CSA F280 calculation, mechanical drawing set, and ventilation summary that leaves this office carries this BCIN number and signature, exactly as the Ontario Building Code requires for HVAC design on Part 9 housing. You can verify the registration yourself through the province's public QuARTS designer registry before you spend a dollar.
Designs follow HRAI methodology under CSA F280-12, with the design temperature, infiltration assumptions, and portal formatting matched to your specific municipality — never regional defaults.
Harvey Juric
Founder — 45+ Years Building Ontario HomesHarvey has been building homes since 1979, in Ontario since the mid-1980s, with 300+ custom homes completed — and has worked with radiant floor heating since the early 1990s and ICF construction since 1995 through icfhome.ca. This service exists because decades on real job sites taught him exactly where permit packages go wrong: the wrong design temperature, the missing MVDS, the package formatted for the wrong portal.
That builder's-eye view is what separates these reports from generic engineering: every calculation is produced by people who have stood in Ontario building departments, dealt with the reviewers, and built the houses the numbers describe.
Three Things That Make Our Reports Different
Every HVAC designer can produce a heat loss report. What building departments flag — and what causes delays — is the details. Here's what we do differently.
We Use Your Municipality's Actual Design Temperature
We Format for Your Building Department's Portal
Flat Rate, Fast, No Scope Creep
Four Principles Behind Every Report
These aren't marketing language — they're the four things that cause us to reject shortcuts that would be easier but wrong.
Accuracy over speed
No generalist assumptions
Transparent pricing, no surprises
Standalone service, no pressure
Three Sites, One Team
We run three connected sites covering Ontario residential construction — HVAC engineering, custom home building, and a free resource library. Each is independent and can be used on its own.
ontarioheatloss.ca
icfhome.ca
buildersontario.com
Upload Your Plans — Quote in 24 Hours.
Send us your floor plans in any format. We'll review them, confirm your municipality's requirements, and send a firm flat-rate quote within 24 hours. No obligation to proceed.
- Correct design temperature for your municipality
- BCIN-stamped — accepted by any Ontario building dept
- Formatted for your portal (Cloudpermit / CityView / counter)
- OBC 2024 compliant — HRV/ERV design included
- Flat-rate pricing — no hourly billing
- 48-hour delivery after payment